Road Safety Evaluation by Gaurav Yadav
Road Profiling 5 – This is part of the Road Safety Evaluation for ASSOCHAM UP-UK done by interns to carry out assessment of road safety measures at every 500 metres on roads of Lucknow, Uttar Pradesh.
Road Profiling 5: An Introduction
Area/Location– Semra, Lucknow, Uttar Pradesh
Road Stretch– Polytechnic Chauraha to CMS Gomti Nagar Extension
Length covered– 2 km, approximately
Date and Time– 06 June to 14 June, 2026
Safe roads play an important role in the public health sector, which is concerned with accident prevention and maintaining safe travel on roads for everyone. Continuous observation of roads and traffic can help detect any underlying danger and make necessary adjustments in time. This periodic surveillance is carried out every week to assess changes in the roads, traffic, and compliance with safety requirements in the Semra locality of Lucknow.
Road Profiling 5: Survey Methodology
● Physical Field Observation: Direct visual assessment of road conditions, pavement quality, and traffic interactions at major intersections.
● Road Profile Assessment: Measurement and recording of road width, presence of dividers, streetlights, and traffic calming measures.
● Geotagged Photography: Capturing photographic evidence every weekend to document infrastructure gaps and traffic behavior.
● Traffic Observation: Monitoring vehicle flow patterns, speed levels, and peak-hour congestion trends during selected dates.
● Local Public Interaction: Brief discussions with residents and commuters to understand recurring safety challenges and local concerns.
Road Profiling 5: A detailed assessment
| Parameters | Observations / Specification |
| Type of road | National Highway |
| NH number | – – |
| Road Width | 7=7.5 m approx |
| Connecting Places | Polytechnic Chauraha to CMS Gomti Nagar Extension |
| Availability of Traffic Lights | Yes (Installed, but not working) |
| Traffic Policemen on Duty | Occasionally |
| Police Chaouki / Thana | 1 nearby |
| Number of road signs | There are road signs for turns, but where there is a college, there is no sign board nor any speed limit board |
| Service Road | Limited, in some place it is there, but some places there is not |
| Bicycle Path | Not available |
| Walkers/Pedestrian Path | Available in Sections |
| Dividers | Available in some sections and at some places it is broken |
| Streetlights | Available (but some are also not working) |
| No. of Speed Breakers | 0 |
| Traffic Volume | – – |
| Number of U-Turns | 2 to 3 |
| Number of Side-cutting Roads | Multiple |
| No. of Big Potholes | Few minor potholes |
| Display Emergency Helpline Nos. | Limited |
| No. of Open Sewerage Tanks/Pot Holes | Few minor potholes |
Road Profiling 5: Continuous Observation Summary
| Date | Survey Week | Traffic Level | Road Condition | Key Observation |
| 06 June 2026 | Week 1 | Moderate | Good | Traffic moving normally and smoothly on the main road. |
| 07 June 2026 | Week 1 | Moderate to High | Good | More cars and bikes on weekends causing small traffic jams near shops. |
| 11 June 2026 | Week 2 | Moderate | Good | Regular everyday traffic with no delays on weekdays. |
| 13 June 2026 | Week 2 | |||
| 14 June 2026 | Week 2 |
Road Profiling 5: Risk Assessment Matrix
| Risk Factor | Observed Level (Update Weekly if changed) | Specific Location / Note |
| Over-speeding | Low to Moderate | Main straight stretch |
| Helmet Compliance | Moderate | Local drivers coming out of side roads |
| Seat Belt Usage | Moderate | People do not wear helmets or seatbelts for short distances. |
| Illegal Parking | Observed at some points | Near commercial shops/market areas |
| Zebra crossings | Limited | Lack of designated painted zebra lines |
| Traffic Jams | Minor | Occurs briefly during evening peak hours |
Road Profiling 5: Cumulative Accident Monitoring Result
| Parameter | Total Count (Cumulative) |
| Total Accidents Recorded | 0 |
| Total Fatalities | 0 |
| Total Injuries | 0 |
Road Profiling 5: Photo Observation Section




